Detailed engineering Gathering System of Cerro Pavilion 3, with scope of the disciplines civil structural, electrical and instrumental and control.
Both parks are expected to provide clean energy to about 407,000 homes. The project is currently under construction.
The project considered the basic and detailed engineering, supplies, construction of civil works, manufacture and assembly of metal structures type geodesic dome to realize the coverage of the coal yard, which covered an area of 45,000 m2.
Improvement of the Service and Instruments air systems of Ventanas 1 and 2. In addition, engineering was done for ESVAL's water use solution.
The Luz del Norte project is the largest photovoltaic (PV) solar power plant in Latin America and occupies 478 hectares of land, diversifying Chile's energy portfolio.
Pares&Alvarez developed the detailed engineering for the seawater system of the new plant, which included the capture, treatment and drive to the plant and its return to the sea.