Detailed engineering for the SWRO desalination plant of 85,000 m2, through the BIM methodology.
The desalination plant considers the use of desalinated water for 100% of the mining process of the Chilean company Minera Spence, which belongs to the Australian multinational BHP Billiton.
Following the earthquake of February 27, 2010, SVTI required a survey of the damage caused by the quake. Pares&Alvarez developed the studies, basic and detailed engineering to address these improvements, in addition to supporting the construction of the work.
The project developed by P&A considered the design of a desalination plant from seawater intake to processed water for Radomiro Tomic Division, Codelco.
The San Antonio Port Company hired Pares&Alvarez to develop the urbanization of the areas located south of the San Antonio Port, which would be oriented to the development of logistics activities.