Industrial Sector

Energy

Client

Acciona Chile

Locations

Commune of Renaico, Araucanía Region

Date

2018-2019

Service Area

Solutions

Detailed engineering for civil works and electrical medium voltag. Engineering site support for the construction Wind Farm San Gabriel.

The wind farms will have a combined capacity of 267 megawatts. The most advanced is San Gabriel, which will be composed of 61 AW132/3000 wind turbines, with 3 MW of nominal power, each wind turbine will mount a rotor of 132 meters in diameter on a concrete tower of 120 meters of hub height, reinforced with anti-seismic technology.

The Tolpán Sur wind farm will have an 84 MW facility, consisting of 28 turbines similar to those planned in San Gabriel. Both parks are expected to provide clean energy to about 407,000 homes. The project is still under construction.