EPC project to build a secondary and tertiary crushing plant parallel to the existing line.
The project to increase production from 240,000 m3/year to 500,000 m3/year of finished plywood also included a 31,000 m2 expansion of the industrial building.
The project carried out by Pares&Alvarez contemplated increasing the factory's production capacity to 405 tons/day of molten glass.
The maritime works were designed to support at least a future desalinated water production of 163,350 m3/day equivalent to 1,890 l/s. At the same time, the plant would have the particularity of producing water in steps up to 840 l/s, reaching a production of 2,177,280 m3/month.