The procurement process can be a determining factor in the execution of a project, which is why we have a team dedicated to purchasing management services.
Minera Zaldívar, of Antofagasta Minerals, selected Pares&Alvarez to develop the detailed engineering and procurement of the project. Previously, our Consulting department had collaborated with AMSA's Corporate Vice Presidency in the feasibility study stage and basic engineering.
This new plant, which doubles the output capacity of the La Negra Chemical Plant, is a responds the Albemarle expansion plan and commitment to consolidate Chile as one of the major players in the global lithium industry.
The Luz del Norte project is the largest photovoltaic (PV) solar power plant in Latin America and occupies 478 hectares of land, diversifying Chile's energy portfolio.
The desalination plant considers the use of desalinated water for 100% of the mining process of the Chilean company Minera Spence, which belongs to the Australian multinational BHP Billiton.
The project developed by P&A considered the design of a desalination plant from seawater intake to processed water for Radomiro Tomic Division, Codelco.
The development of the project to reduce energy consumption included conceptual, basic and detailed engineering.
Expansion of the glass packaging production plant and also considered the installation of a new furnace and three packaging production lines. For this, the existing industrial warehouse was expanded by 14,000 m2.
Conceptual, basic and detailed engineering in all specialties; management of the procurement of equipment abroad, archaeological survey and obtaining related environmental permits.
Pares&Alvarez developed the detailed engineering for the seawater system of the new plant, which included the capture, treatment and drive to the plant and its return to the sea.