Mauricio Saldías, country manager of P&A Australia, participated in the luncheon that WAMC held on July 29 in Perth.
We were born knowing that our country is one of those with the highest seismic and volcanic activity in the world, which is why it is so important to have academics and professionals of the highest technical-scientific level in seismic resistant design.
The BIM methodology allowed us to take on this challenge with the experience of working on collaborative models.
The importance of this new terminal lies in the fact that from now on, all liquefied gas distributed in the north will be unloaded in Mejillones and not in Valparaíso.
In March 2021, SUBTEL reported that 62.6% of households in the country have a fixed internet connection, registering a growth of 12.5% per year, and of these households, almost 70% correspond to fiber optic connections.
P&A is developing the detailed engineering for the pilot plant, after supporting the processing of the Environmental Impact Statement for the carbon neutral e-fuels project.
Tailings deposits and the circular economy, an opportunity to reduce the generation of waste to the environment.
With regard to environmental pollution in the industrial sector, Pares&Alvarez has developed, during the last 10 years, various services and solutions related to its mitigation.